当前位置:首页 > 新闻中心
Stainless steel gate installation specification problem |
发布日期:2022-04-21 22:07:00 点击数:743 次 新闻来源: |
How should the stainless steel gate be installed? What are the specifications for the installation of stainless steel gates? Let's find out together! 1 When the pipe gallery pipes entering and leaving the device are connected to the main pipes on the pipe gallery of the whole plant, a valve for cutting off must be installed. The installation position of the valve should be centrally arranged on one side of the device area, and the necessary operation platform or maintenance platform should be set up. 2 Valves that require frequent operation, maintenance and replacement should be located on the ground, platform or ladder easily accessible. Pneumatic and electric valves should likewise be located within easy access. 3 Valves that do not need to be operated frequently (only used when driving and parking), if they cannot be operated on the ground, should also be arranged in a place where a temporary ladder can be erected. 4. The height between the center of the valve handwheel and the operation surface is between 750 and 1500mm, and the suitable height is 1200mm. The installation height of the valve that does not need frequent operation can reach 1500 to 1800mm. When the installation height cannot be lowered and frequent operations are required, an operating platform or steps should be provided in the design. Valves on pipes and equipment for hazardous media shall not be set within the height range of people's heads. Through the above introduction, you should know what are the specifications for the installation of stainless steel gates! |
上一个:Design Concept of Stainless St... 下一个:What are the precautions for t... |
---|
联系我们
欢迎访问温州匠锐阀门科技有限公司官方网站!!! 公司地址:温州市永嘉县瓯北街道和三工业区扫一扫 更多精彩
微信二维码